Land At Bearnshaw Tower Forest Carr Road Todmorden Calderdale
Upgrading of forest track
Calderdale, Yorkshire and the Humber · Looking for a specific address instead? Search by postcode
Last 30 days
Upgrading of forest track
Carry out a programme of essential improvement works to a section of our existing 11kV overhead electricity network. The scheme involves rebuilding sections of the existing overhead line and replacing poles that have reached the end of their serviceable life and undertake some interpoling works
Carry out a programme of essential improvement works to a section of our existing 11kV overhead electricity network. The scheme involves rebuilding sections of the existing overhead line and replacing poles that have reached the end of their serviceable life and undertake some interpoling works
Carry out a programme of essential improvement works to a section of our existing 11kV overhead electricity network. The scheme involves rebuilding sections of the existing overhead line and replacing poles that have reached the end of their serviceable life and undertake some interpoling works
Carry out a programme of essential improvement works to a section of our existing 11kV overhead electricity network. The scheme involves rebuilding sections of the existing overhead line and replacing poles that have reached the end of their serviceable life and undertake some interpoling works
Carry out a programme of essential improvement works to a section of our existing 11kV overhead electricity network. The scheme involves rebuilding sections of the existing overhead line and replacing poles that have reached the end of their serviceable life and undertake some interpoling works
Carry out a programme of essential improvement works to a section of our existing 11kV overhead electricity network. The scheme involves rebuilding sections of the existing overhead line and replacing poles that have reached the end of their serviceable life and undertake some interpoling works
Carry out a programme of essential improvement works to a section of our existing 11kV overhead electricity network. The scheme involves rebuilding sections of the existing overhead line and replacing poles that have reached the end of their serviceable life and undertake some interpoling works
Replace the existing open wire conductors in favour a Aerial Bunched Conductor
Carry out a programme of essential improvement works to a section of our existing 11kV overhead electricity network. The scheme involves rebuilding sections of the existing overhead line and replacing poles that have reached the end of their serviceable life and undertake some interpoling works - Mytholmroyd Canal Wharfe
Prior approval application for proposed single storey rear extension, extending out by 4.40 metres, maximum height 3.29 metres and 2.56 metres to eaves.
Replace the existing open wire conductors in favour of an Aerial Bunched Conductor
Fell one Holly tree (Tree in a Conservation Area)
Replace existing open wire conductors with aerial bunched conductor
Retention and continued use of existing temporary modular classroom accommodation for a further period of 7 years
Fell Two Cherry Trees at Front of AICP Centre Site, Facing Hopwood Lane. These trees have become a significant safety concern. During the recent storms, several very large branches fell from the trees onto the public pavement and the road. Also one of the trees has a pronounced lean, and this leaning nature means further branches, or the trees themselves, could fail and cause considerably more damage.
Proposed residential development of up to six houses
Replace exisiting wire conductors for aerial bunched conductor
Prune one tree (Tree in a Conservation Area)
Replace existing open wire conductors with aerial bunched conductor
Replace existing open wired conductors in place of aerial bunched conductor